GreenGo Energy has completed its largest solar park in Denmark to date, a state-of-the-art 60 MWp facility located in Urup, Jutland. The park is now fully connected to the grid and operating at full capacity.
Designed and built with cutting-edge technology, the solar park features advanced tracker solar panels optimised for maximum energy production, adapting to the sun’s movement throughout the day. In addition, the solar park is collocated with a wind park, optimising land usage and minimising its environmental footprint. The facility will be able supply to electricity to approximately 6,500 households, contributing to Denmark’s renewable energy goals.
The project is owned by Doral Energy, a leading company in renewable energy investment, development, construction and operation.
As lead counsel to GreenGo Energy, Accura has assisted with the development of the project, and we congratulate GreenGo Energy on reaching this impressive milestone.
Accura’s global-leading Renewable Energy Team consists of more than 100 experts, providing advice exclusively on renewable energy.
Photo: GreenGo Energy